Beckton Hall Road Energy Recovery Project

Show more
hydroturbine

hydroturbine

hydroturbine
Read More
Show more
hydroturbine

hydroturbine

hydroturbine
Read More
Show more
hydroturbine

hydroturbine

hydroturbine
Read More

Beckton Hall Road Energy Recovery Project

Water Resources

(Hydro Turbine Project)

EnTech, working with an internationally-recognized engineering firm, prepared a preliminary design report for the City of Sheridan’s Beckton Hall Road Energy Recovery Project.  The report recommended installation of a 260 KW hydroelectric generator on the City’s 30” raw water transmission main.  Prior to installation of the hydroelectric generator, energy from the 280-psi transmission main was dissipated through of use of pressure-reducing valves.

Throughout the design of the generator system, EnTech provided design surveying and local project coordination.  EnTech then provided onsite construction observation through the project startup.